This job was one of my favorite jobs, I wish I had pictures of the house before i arrived. Here's a house where the homeowner wanted the entire basement tiled and a custom shower installed where a tub surround previously stood. The problem was that the slab was badly out of level and dropped about 2" on one side of the house, I informed the H/O that prep work was a must in order to achieve the result he wanted. My method of attack was a mud bed, I knew I needed to add a couple inches to the floor and Self leveler wasn't fit for this application. I bonded the mud with thinset and leveled out about 200 sq ft of the 700 sq ft floor.
The next thing I did was change a tub surround to a shower stall, I removed sections of the slab cut into a cast iron pipe and installed pvc and centered the drain, then i filled the hole and patched with the proper concrete mix. I then constructed a curb out of 2x4s. Next I prepitched the shower to prepare for my CPE Noble pan. The following day I installed the pan performed a water test and installed the proper cbu on the walls. Next Laticrete Hydrobarrier was applied to the walls to act as a liquid membrane to waterproof the shower walls. I then mudded the floor of the shower, installed an Ebbe square drain and mudded the shower curb. Heres is the shower complete w/ the ceiling also tiled and the rest of the basement. I'll tell you what, this is one sweet pad!
Monday, May 3, 2010
Subscribe to:
Posts (Atom)